Assistance Scheme To Build Barbed Wire Fences Around The Farm For Farmers

Assistance Scheme To Build Barbed Wire Fences Around The Farm The scheme of providing financial assistance to the farmers for erection of iron barbed wire fence around the farm to prevent damage to the crops of the prolific wild animals was continued with the resolutions / amendments of this section numbered (1) to (2).

This plan can be read on Dumma: (3) of this section. With the resolution dated 31/4/2018, the work was transferred to the Rural Development Division under the Department of Panchayat, Work Housing and Rural Development.

As for each the request of Gujarat country nation education Corporation to keep on the scheme, in the make financial arrangements of the day 2020-21, Rs. 1.00 lakh sign provision was made.

And for the day 2020-21, the comprehension was never-ending with the declaration old-fashioned 05/09/2060 of this region as apiece the impression number.

Implementation method as per the resolution of 06/09/2020, the standard of assistance, a matter of change in eligibility of beneficiary and Rs. Resolution: After careful consideration by the Government.

The implementation office of this scheme will be Gujarat Agro Industries Corporation instead of Gujarat State Land Development Corporation Ltd.

It is decided to compensate for the provision of Rs. 200,000 (twenty thousand) lakhs in the revised estimates for the year 2020-21 and to spend and give administrative sanction subject to the following conditions. 

Implementing as follows and in the provision of Rs. 19.00 (nineteen thousand nine hundred and ninety) lakh increased to Rs.

5% of the administrative cost (including the cost of publicity) for the implementation of this scheme will be borne by Gujarat Agro Industries Corporation Ltd. Will get.

Wire Fencing Goods – Specification of Materials Gujarat Agro Industries Corporation Ltd. It has to be decided in advance and get the approval of the state government. 

  • Applications have to be received through the i-farmer portal and approval of the State Government for allotment of district-wise targets as well as in case of further applications approval has to be given through the online draw system but at the end of the year unsubscribed applications are to be carried forward to next year. So that the beneficiary does not need to re-apply. 
  • Before approving the application, the wire fencing at the site should be checked by third party inspection, and also after the completion of the work, i should be checked by third party inspection and final payment should be made only after the third-party inspection report. GPS location tagging should be done at the time of verification. The implementing agency of this scheme will be Gujarat Agro Industries Corporation Ltd. Must be made separately by and approved by the State Government. 
  • Five% of the administrative cost (including the cost of publicity) for the implementation of this scheme will be incurred by Gujarat Agro Industries Corporation Ltd. Will get. Wire Fencing Goods – Specification of Materials Gujarat Agro Industries Corporation Ltd. It has to be decided in advance and get the approval of the state government. The design of wire facing has been prepared by Gujarat Agro Industries Corporation Ltd. and approved by the State Government. 

The design of wire facing should be prepared by Gujarat Agro Industries Corporation Ltd. and published after getting approval from the State Government. The farmer will not be able to build a wire fence with low quality or low-quality goods due to the design decision.

After constructing the fence, the farmer has to maintain it at his own cost. Farmers will get the benefit of this scheme only once in that survey number. And the benefit of this scheme will not be available as a member of the re-group for the survey number who has got the benefit of the scheme earlier. – The scheme will be implemented across the state. 

In the revised estimates for the year 2020-21, the additional provision has to be offset and the expenditure has to be made within the limits of the grant allotted by the Finance Department from time to time subject to the provision.